What should I include in a scope for a quantity surveyor?
Summary: Estimates and tracks construction cost.
Why it matters: Lenders often require a QS report for construction loans and progress draws, especially for owner-builders.
When needed: Lender requirement, tight budget, or comparing builder quotes.
Minimum scope by stage
- Concept: cost estimate to check the design against budget
- Before tender: detailed estimate or bill of quantities from the construction documents; lender cost report if required
- Construction: progress or draw-down reports for the lender; variation cost review
- Completion: final cost report
Options
- Review of builder or trade quotes
- Cost-to-complete reports
- Tax depreciation schedule (investment properties)
Meetings and site visits: Desktop for estimates; one site visit per progress report.