Home building glossary
Plain English meanings of 718 Australian building and construction terms.
A
- Absorption Pit
- Underground pit allowing stormwater infiltration.
- Accessibility Standards
- Requirements for access by people with disabilities.
- AEP (Annual Exceedance Probability)
- Likelihood of flood event in any year.
- Agricultural Drain
- Subsurface pipe removing excess water from land.
- Allotment
- Individual lot or parcel of subdivided land.
- Allotment Drainage
- Stormwater drainage system for individual lots.
- Amendment
- Change to planning scheme or controls.
- Annotated Drawing
- Drawing with explanatory notes.
- Approval
- Official permission from planning authority.
- Approved Subdivision
- Subdivision approved by consent authority.
- APZ (Asset Protection Zone)
- Managed land reducing bushfire attack.
- Architect
- Licensed professional designing buildings and overseeing construction.
- Architectural Drawings
- Set of plans showing building design.
- Architectural Plans
- Drawn representations of building layout.
- ARI (Annual Recurrence Interval)
- Average time between flood events of given size.
- As-Built Documentation
- Documents showing final constructed condition.
- As-Built Drawing
- Drawing showing actual construction as completed.
- As-Built Plan
- Plan reflecting actual construction completed.
- Assembly Detail
- Drawing showing how components fit together.
- Assessment
- Evaluation of development application.
- Asset Protection Zone (APZ)
- Managed land reducing bushfire attack.
- Attack Level
- See Bushfire Attack Level.
- Australian Building Codes Board (ABCB)
- Body maintaining National Construction Code.
- Axonometric Drawing
- Three-dimensional drawing without vanishing points.
B
- BAL (Bushfire Attack Level)
- Rating system measuring bushfire risk to buildings.
- BAL-12.5
- Low bushfire attack level requiring minimal construction measures.
- BAL-19
- Moderate bushfire attack level requiring specific construction standards.
- BAL-29
- High bushfire attack level requiring enhanced construction.
- BAL-40
- Very high bushfire attack level requiring significant protection.
- BAL-FZ
- Flame Zone - highest bushfire risk requiring maximum protection.
- BAL-LOW
- Minimal bushfire risk area with standard construction.
- Base Flood Level
- Water level during design flood event.
- Baseline
- Primary reference line for measurements.
- BASIX (Building Sustainability Index)
- NSW scheme that sets water, energy and thermal comfort targets for new homes and some alterations. A BASIX certificate is produced with an online tool and lodged with your approval, and the commitments on it must be built.
- Batter
- The slope of an embankment or cutting, expressed as ratio or angle.
- Battering
- Creating sloped surfaces for stability and drainage.
- Battle-Axe Lot
- Lot with narrow access strip to street (like axe shape).
- Bearing Capacity
- The load-carrying ability of soil under foundation loads.
- Bench Mark (BM)
- A surveyed reference point with known elevation.
- Benching
- Cutting stepped terraces into slopes for stability.
- Berm
- A flat ledge or shoulder on slope or embankment.
- Bid Drawing
- Drawing issued for contractor bidding.
- Bid Set
- Complete set of drawings for bidding.
- Bidding Documents
- Documents for contractor bidding process.
- Bill of Quantities (BOQ)
- Itemised list of quantities for costing.
- BIM Drawing
- Drawing extracted from building information model.
- BIM Model
- Building information model representing building.
- Bioretention Basin
- Landscaped depression filtering and infiltrating stormwater.
- Block Diagram
- Simple diagram showing major elements and relationships.
- Boundary
- Legal limit of property or lot.
- Boundary Adjustment
- Minor change to lot boundaries.
- Boundary Survey
- Official determination of property limits.
- Bubble Diagram
- Schematic showing space relationships.
- Building Application
- Request for building permit.
- Building Certifier
- Professional verifying compliance with building codes.
- Building Code
- Regulations for building construction.
- Building Inspector
- Official examining construction for code compliance.
- Building Permit
- Official approval to construct.
- Building Section
- Vertical slice through building showing heights and construction.
- Building Surveyor
- Professional assessing building condition and defects.
- Bulk Earthworks
- Large-scale excavation, filling, and grading operations.
- Bushfire
- Uncontrolled fire in bush, forest, or grassland.
- Bushfire Assessment
- Evaluation of bushfire risk for development.
- Bushfire Attack
- Impact of fire, heat, embers, and smoke on buildings.
- Bushfire Consultant
- Specialist assessing bushfire risk and protection measures.
- Bushfire Hazard
- Potential threat from bushfire.
- Bushfire Management Plan
- Strategy managing bushfire risks for development.
- Bushfire Prone Area
- Land identified as at risk from bushfire.
- Bushfire Prone Land
- See Bushfire Prone Area.
- Bushfire Protection Measures
- Construction and landscaping reducing fire risk.
- Bushfire Report
- Document detailing bushfire assessment and requirements.
- Bushfire Risk
- Likelihood and consequence of bushfire impact.
- Bushfire Risk Assessment
- Analysis of bushfire danger and required protection.
- Bushfire Shutters
- Closures protecting windows from ember attack.
C
- CAD Drawing
- Drawing created with computer-aided design software.
- Cadastral Survey
- Survey defining property boundaries and land parcels.
- Callout
- Annotation pointing to specific element.
- Catchment
- Area draining to a common point or watercourse.
- Catchment Area
- Total land area contributing runoff to drainage system.
- CBR (California Bearing Ratio)
- Test measuring soil strength for pavement design.
- Ceiling Plan
- Drawing showing ceiling treatments and lighting locations.
- Centre Line
- Light line indicating axis or centre.
- Certificate of Title
- Legal document proving land ownership.
- Certification
- Verification of compliance with codes.
- Channel
- Open watercourse conveying stormwater.
- Check Mark
- Symbol indicating verification or approval.
- Circulation Diagram
- Diagram showing movement paths.
- Civil Contractor
- Contractor specialising in infrastructure and earthworks.
- Civil Engineer
- Professional designing infrastructure, roads, drainage systems.
- Civil Works
- Infrastructure construction including roads, drainage, utilities.
- Classified Vegetation
- Vegetation type influencing bushfire risk.
- Coastal Flooding
- Inundation from sea level rise or storm surge.
- Colour-Coded Drawing
- Drawing using colours to distinguish elements.
- Commissioning Plan
- Document for equipment startup and testing.
- Common Property
- Land owned jointly by lot owners.
- Community Title
- Subdivision creating common property and individual lots.
- Compaction
- Process of densifying soil to increase bearing capacity.
- Compaction Test
- Laboratory or field test measuring soil density.
- Compliance
- Meeting all legal requirements and standards.
- Compliance Certificate
- Document confirming code compliance.
- Complying Development Certificate (CDC)
- Complying development is a combined planning and construction approval for straightforward development that can be determined through a fast-track assessment by a council or an accredited certifier
- Concept Design
- Initial design exploration of ideas and possibilities.
- Concept Scheme
- Basic design arrangement before refinement.
- Conceptual Diagram
- Diagram illustrating design concept.
- Conditions of Consent
- Requirements attached to development approval.
- Conditions of Development
- See Conditions of Consent.
- Connection Detail
- Drawing showing how elements join.
- Consent
- See Development Consent.
- Consolidation
- Combining multiple lots into single title.
- Construction Administration (CA)
- Phase where architect oversees construction implementation.
- Construction Administration Phase
- Phase supervising and administering construction contract.
- Construction Certificate
- Approval that plans comply with Building Code.
- Construction Document Phase
- Phase creating documents required for bidding and construction.
- Construction Documents (CD)
- Detailed drawings and specifications for construction.
- Construction Drawings
- Complete set of drawings for construction.
- Construction Standard
- Requirements for bushfire construction areas.
- Constructive Details
- Drawings showing how components connect.
- Contour
- Line on plan connecting points of equal elevation.
- Contour Line
- See Contour.
- Contour Survey
- Survey mapping ground elevation variations.
- Contract Documents
- Documents forming construction contract basis.
- Contractor
- Company or individual undertaking construction work.
- Coordination Drawing
- Drawing showing how different systems work together.
- Coordination Meeting
- Meeting reviewing drawing coordination.
- Corner Lot
- Lot at intersection of two streets.
- Council
- Local government authority.
- Cross Section
- Section cutting perpendicular to main axis.
- Culvert
- Pipe or structure conveying water under road or embankment.
- Cut
- Excavation removing earth to lower ground level.
- Cut and Fill
- Earthwork balancing excavation with filling.
- Cutaway View
- Drawing showing interior by removing portions.
- Cutting
- Excavated area or trench through higher ground.
D
- DA
- See Development Application.
- Datum
- Reference line or plane for measurements.
- Datum Level
- Reference elevation for site measurements (often AHD).
- DCP
- See Development Control Plan.
- Deemed-to-Satisfy (DTS)
- Compliance through prescribed solutions.
- Deemed-to-Satisfy Provisions
- Prescriptive code solutions.
- Defects Liability
- Period during which builder rectifies defects.
- Defendable Space
- Managed area around building reducing fire risk.
- Deferred Commencement
- Approval delayed pending conditions.
- Deposited Plan (DP)
- Registered survey plan showing subdivision.
- Design Approval
- Official acceptance of design by authorities.
- Design Brief
- Project requirements document guiding design process.
- Design Clarification
- Explanation of design intent or details.
- Design Coordination
- Ensuring all design disciplines work together.
- Design Development (DD)
- Second phase refining schematic design with greater detail.
- Design Development Phase
- Phase developing approved schematic design further.
- Design Flood
- Flood event for which protection is designed.
- Design Flood Level (DFL)
- Water surface elevation for design flood.
- Design Freeze
- Point at which design is finalised and no further changes made.
- Design Guidelines
- Standards controlling design approach for project.
- Design Integration
- Process combining different design elements cohesively.
- Design Intent
- Original purpose and vision behind design decisions.
- Design Modifications
- Alterations to design meeting new requirements.
- Design Narrative
- Written explanation of design philosophy and approach.
- Design Principles
- Fundamental concepts guiding design decisions.
- Design Professional
- General term for architects, engineers, and specialists.
- Design Program
- Detailed list of space requirements and specifications.
- Design Review
- Evaluation of design by stakeholders or authorities.
- Design Revisions
- Changes made to design during development.
- Design Sketch
- Drawing clarifying design approach or details.
- Design Standards
- Required specifications for design elements.
- Detail
- Large-scale drawing showing specific assembly or connection.
- Detailed Design
- Design with specific dimensions and material specifications.
- Details
- Plural of Detail.
- Detention Basin
- Temporary storage area slowing stormwater release.
- Detention System
- Infrastructure temporarily storing stormwater.
- Developer
- Entity undertaking property development projects.
- Development
- Carrying out of building, engineering, or other operations.
- Development Application (DA)
- Formal request to undertake development.
- Development Approval
- Official permission to proceed with development.
- Development Consent
- Permission granted for development application.
- Development Contribution
- Payment towards infrastructure costs.
- Development Control Plan (DCP)
- Guidelines supplementing planning scheme.
- Development Proposal
- Submitted plan for new development or change of use.
- Development Standard
- Minimum requirement in planning scheme.
- DFL
- See Design Flood Level.
- Digital Drawing
- Drawing created using computer software.
- Dimension
- Linear measurement marked on drawing.
- Dimension Line
- Line indicating dimension between points.
- Dimensioning
- Process of marking measurements on drawings.
- Discharge
- Volume of water flowing past point per unit time.
- Discharge Point
- Location where stormwater exits drainage system.
- Diversion Channel
- Channel redirecting water flow.
- Door Schedule
- List of all doors with specifications.
- Downpipe
- Vertical pipe carrying roof water to drainage system.
- DP
- See Deposited Plan.
- Drain
- Pipe or channel removing stormwater or wastewater.
- Drainage Basin
- See Catchment.
- Drainage Easement
- Legal right for drainage infrastructure on property.
- Drainage Line
- Natural or constructed watercourse.
- Drainage Plan
- Drawing showing stormwater and wastewater systems.
- Drainage Reserve
- Land reserved for drainage infrastructure.
- Drainage System
- Network collecting and conveying stormwater.
- Drawing Index
- List of all drawings in set.
- Drawing List
- See Drawing Index.
- Drawing Markup
- Annotations or corrections to drawing.
- Drawing Number
- Identification code for each drawing.
- Drawing Title
- Name or description of drawing content.
- Dry Well
- Pit allowing stormwater infiltration into soil.
- Dual Occupancy
- Two dwellings on one lot of land.
E
- Easement
- Right to use another's land for specific purpose (access, drainage, services).
- Effective Slope
- Ground slope affecting fire behaviour under building.
- EIS
- See Environmental Impact Statement.
- Electrical Drawings
- Set of plans showing electrical design.
- Electrical Engineer
- Professional designing electrical systems.
- Electrical Layout
- Drawing showing electrical outlet and switch locations.
- Electrical Permit
- Approval for electrical work.
- Electrical Plan
- Drawing showing electrical system layout.
- Elevation
- Drawing showing exterior or interior vertical view.
- Elevations
- Plural of Elevation.
- Embankment
- Raised earth structure above natural ground level.
- Ember Attack
- Ignition from windborne embers ahead of fire front.
- Ember Guard
- Mesh preventing ember entry through openings.
- Energy Compliance Certificate
- Document confirming energy efficiency standards.
- Energy Dissipator
- Structure reducing water velocity and erosion.
- Energy Efficiency
- Design minimising energy consumption.
- Engineering Plans
- Detailed drawings for subdivision infrastructure.
- Environmental Assessment
- Study of development's environmental impacts.
- Environmental Impact Statement (EIS)
- Detailed study of major development impacts.
- Environmental Planning Instrument
- Legal planning document (LEP, SEPP).
- Equipment Schedule
- List of equipment to be installed.
- Erosion
- Wearing away of soil by water or wind.
- Erosion Control
- Measures preventing soil loss.
- Estimator
- Professional calculating construction costs.
- Evacuation Route
- Designated path for leaving flood-prone areas.
- Excavation
- Removal of soil, rock, or other materials from site.
- Exhibition
- Public display period for proposed planning changes.
- Exhibition Period
- Time public can view and comment on proposals.
- Exploded View
- Drawing showing components separated for clarity.
- Exposure
- Direction building faces relative to fire approach.
- Exterior Elevations
- Drawings showing building facades.
F
- Facilities Manager
- Professional managing building operations.
- Feasibility Study
- Investigation determining if project is viable.
- Fill
- Imported or relocated material raising ground level.
- Filter Strip
- Vegetated area treating stormwater runoff.
- Final Approval
- Ultimate acceptance of design before construction.
- Final Design
- Completed design ready for construction.
- Final Drawing
- Last drawing issued before project close.
- Final Plan
- Completed survey plan registered with Land Titles Office.
- Finish Schedule
- List specifying finishes for each space.
- Fire Danger Index (FDI)
- Measure of fire weather conditions.
- Fire Danger Rating
- System communicating fire danger level.
- Fire Front
- Leading edge of bushfire.
- Fire Management Plan
- Strategy for fire prevention and response.
- Fire Prone Vegetation
- Plants contributing to bushfire fuel load.
- Fire Rating
- Resistance of building element to fire in minutes.
- Fire Resistance Level (FRL)
- Time building element resists fire (e.g., 60/60/60).
- Fire Retardant
- Coating or treatment reducing flammability.
- Fire Safety
- Requirements preventing fire spread and ensuring egress.
- Fire Safety Certificate
- Document confirming fire safety compliance.
- Fire Trail
- Access route for firefighting vehicles.
- Fixture Schedule
- List of plumbing or electrical fixtures.
- Flame Contact
- Direct contact with flames during bushfire.
- Flame Zone
- Area subject to direct flame contact - see BAL-FZ.
- Flash Flooding
- Sudden flooding from intense rainfall.
- Flood
- Overflow of water onto normally dry land.
- Flood Affectation
- Land subject to flooding.
- Flood Assessment
- Study determining flood risk and levels.
- Flood Event
- Occurrence of flooding.
- Flood Extent
- Area covered by flood waters.
- Flood Fringe
- Land subject to shallow or infrequent flooding.
- Flood Hazard
- Danger to life and property from flooding.
- Flood Impact Assessment
- Analysis of development's effect on flooding.
- Flood Level
- Elevation of water surface during flood.
- Flood Liable Land
- Land susceptible to flooding.
- Flood Mitigation
- Measures reducing flood risk and impact.
- Flood Model
- Computer simulation predicting flood behaviour.
- Flood Planning Area
- Land potentially affected by flooding up to probable maximum flood.
- Flood Planning Level (FPL)
- Minimum floor level accounting for flood risk and freeboard.
- Flood Prone Land
- Land susceptible to flooding from defined flood event.
- Flood Protection
- Infrastructure or design preventing flood damage.
- Flood Report
- Document detailing flood risk and recommendations.
- Flood Risk
- Combination of flood likelihood and consequences.
- Flood Risk Management
- Approach addressing flood risks.
- Flood Storage
- Volume of water stored in floodplain.
- Flood Study
- Investigation of flooding behaviour and extent.
- Floodplain
- Land adjoining watercourse subject to inundation.
- Floodplain Management
- Coordinated approach managing flood-prone areas.
- Floodplain Risk Management Plan
- Strategy managing flood risks.
- Floodway
- Part of floodplain conveying significant flow.
- Floor Plan
- Top-down view of a building storey or level.
- Floor Plans
- Drawings showing room arrangements at each level.
- Flow Diagram
- Diagram showing process or material flow.
- Footing
- Foundation element distributing building loads to soil.
- Foreman
- Supervisor of construction workers on-site.
- Foundation Plan
- Drawing showing foundation design and footings.
- FPL
- See Flood Planning Level.
- Freeboard
- Additional height above design flood level for safety margin.
- French Drain
- Gravel-filled trench with perforated pipe for drainage.
- FRL
- See Fire Resistance Level.
- Frontage
- Width of lot along street boundary.
- Fuel Load
- Amount of combustible vegetation in area.
- Fuel Reduction
- Removal or modification of combustible materials.
- Function Diagram
- Diagram showing relationships between spaces.
G
- Gateway Determination
- Initial approval for planning proposal to proceed.
- General Conditions
- Standard contract terms and conditions.
- General Contractor
- Primary contractor responsible for overall project.
- General Specifications
- Requirements applying to entire project.
- Geotechnical Engineer
- Engineer specialising in soil mechanics and foundations.
- Geotechnical Investigation
- Testing and analysis of soil conditions.
- Geotechnical Report
- Document detailing soil conditions and foundation recommendations.
- GPT (Gross Pollutant Trap)
- Device removing litter and debris from stormwater.
- Grade
- Ground surface level or slope.
- Gradient
- Slope of drain, channel, or surface for water flow.
- Grading
- Shaping of site to achieve desired elevations and drainage.
- Grading Plan
- Drawing showing site elevation changes and earthwork.
- Graphic Symbol
- Drawing symbol representing element.
- Grated Inlet
- Surface drain with grate preventing blockage.
- Green Title
- Individual freehold land title with no common property.
- Grid
- Reference system using letters and numbers.
- Grid Lines
- Reference lines forming measurement grid.
- Ground Beam
- Reinforced concrete beam at or near ground level.
- Ground Level (GL)
- Natural or finished ground surface elevation.
- Ground Slope
- The incline or gradient of land surface.
- Groundwater
- Water present below ground surface in soil pores.
- Groundwater Level
- Depth below surface where soil is saturated.
- Growth Area
- Designated region for future urban development.
- Gully
- Surface water inlet; or small valley.
- Gully Pit
- Pit collecting surface water for drainage system.
- Gully Trap
- Drain fitting with water seal preventing odours.
H
- Habitable Room
- Room used for living purposes (must be above flood level).
- Hamlet Lot Subdivision
- Rural subdivision creating small lots.
- Hatch Pattern
- Pattern indicating material type on drawing.
- Haul Road
- Temporary road for moving earth and materials.
- Head
- Water pressure expressed as elevation difference.
- Health & Safety Officer
- Professional ensuring workplace safety compliance.
- Health & Safety Regulations
- Laws protecting worker safety.
- Heritage Listing
- Formal recognition of item's heritage significance.
- HVAC Layout
- Drawing showing duct locations and equipment.
- HVAC Plan
- Drawing showing heating and cooling system layout.
- Hydraulic Category
- Classification of flood hazard and behaviour.
- Hydraulic Grade Line (HGL)
- Line showing water pressure in pipe system.
- Hydraulic Model
- Computer model simulating water flow.
- Hydrological Study
- Analysis of water flow and drainage patterns.
I
- Impervious Area
- Surfaces preventing water infiltration (roofs, paving).
- Imported Fill
- Material brought to site to raise ground levels.
- Infiltration
- Movement of water into soil from surface.
- Infiltration Basin
- Depression allowing stormwater to soak into ground.
- Infrastructure
- Essential systems and facilities serving development.
- Infrastructure Charges
- Fees for water, sewer, roads, and services.
- Infrastructure Planning
- Planning for roads, utilities, and community facilities.
- Inlet
- Opening where water enters drainage system.
- Inner Protection Area (IPA)
- Zone immediately around building with minimal vegetation.
- Inspection
- Official examination of work for compliance.
- Inspection Report
- Document recording official inspection results.
- Insurance
- Required coverage for construction and building.
- Insurance Requirements
- Document specifying required insurance coverage.
- Integrated Housing
- Mixed housing types in subdivision.
- Interim Drawing
- Temporary drawing during design development.
- Interior Designer
- Professional designing interior spaces and finishes.
- Interior Elevations
- Drawings showing interior wall treatments.
- Inundation
- Flooding or submersion of land.
- Invert
- Bottom inside surface elevation of pipe or channel.
- IPA
- See Inner Protection Area.
- Isometric Drawing
- Three-dimensional drawing showing three sides equally.
- Issue for Construction
- Drawings released for building phase.
- Issue for Permit
- Drawings submitted to authorities.
K
- Kerb and Gutter
- Road edge with drainage channel.
- Kerb Inlet
- Opening in kerb allowing water to enter drain.
L
- Land Division
- See Subdivision.
- Land Management Zone
- Designated area with vegetation management requirements.
- Land Release
- Making land available for urban development.
- Land Use
- Permitted activity or purpose on land.
- Land Use Zone
- Classification determining permitted uses.
- Land Use Zoning
- Designation of permitted uses.
- Landscape Architect
- Professional designing outdoor spaces.
- Landscape Plan
- Drawing showing outdoor plantings and features.
- Legal Point of Discharge
- Approved location for stormwater drainage.
- Legend
- Key explaining symbols used on drawings.
- LEP
- See Local Environmental Plan.
- Levee
- Embankment preventing floodwaters from entering area.
- Level
- Elevation relative to datum; or surveying instrument.
- Level Spreader
- Device distributing flow evenly across width.
- Levelling
- Process of determining or creating level surfaces.
- Liability
- Legal responsibility for damages or injuries.
- Licence
- Official permission to practise trade or profession.
- Lighting Design
- Planning of lighting including intensity and colour.
- Lighting Plan
- Drawing showing artificial lighting locations.
- Line Style
- Type of line (solid, dashed, phantom) indicating element type.
- Line Weight
- Thickness of drawing lines conveying information.
- Linen Plan
- Architectural plan on linen fabric (historical).
- Local Area Plan
- Plan for specific neighbourhood or suburb.
- Local Environmental Plan (LEP)
- Primary planning control instrument.
- Local Regulations
- Municipality-specific requirements.
- Longitudinal Section
- Section cutting along length of building.
- Lot
- Individual parcel of land in subdivision.
- Lot Consolidation
- See Consolidation.
- Lot Size
- Area of individual land parcel.
M
- Maintenance Manual
- Guide for system maintenance requirements.
- Major Drainage System
- System handling rare large storm events.
- Master Plan
- Comprehensive development plan for large area.
- Material Callout
- Annotation specifying material to be used.
- Material Indication
- Symbol or pattern showing material.
- Material Schedule
- List of materials to be used in project.
- Matrix Diagram
- Grid comparing multiple factors.
- Means and Methods
- How work is to be performed (specification).
- Mechanical Drawings
- Set of plans showing mechanical design.
- Mechanical Engineer
- Professional designing HVAC and mechanical systems.
- Mechanical Permit
- Approval for HVAC and mechanical work.
- Mechanical Plan
- Drawing showing mechanical systems.
- Minimum Floor Level
- Lowest permissible floor elevation relative to flood level.
- Minor Drainage System
- System handling frequent smaller storms.
- Mixed Use Development
- Development combining residential and commercial uses.
N
- NatHERS (Nationwide House Energy Rating Scheme)
- National scheme that rates a home design out of 10 stars for thermal performance, using accredited software, your plans and the local climate zone. It is the most common way to show a new home meets the National Construction Code energy efficiency requirements.
O
- Objection
- Formal opposition to development or rezoning.
- Oblique Drawing
- Three-dimensional drawing with parallel projection.
- Occupancy Permit
- Approval to occupy completed building.
- Occupation Certificate
- Permission to occupy completed building.
- On-Site Detention (OSD)
- Stormwater storage on individual properties.
- One-Point Perspective
- Drawing with single vanishing point.
- OPA
- See Outer Protection Area.
- Operations Manual
- Guide for building operation and maintenance.
- Organisational Chart
- Diagram showing hierarchical structure.
- Orthographic Drawing
- Standard projection drawing (plan, section, elevation).
- Orthographic Projection
- Standard drawing projection method.
- OSD
- See On-Site Detention.
- Outer Protection Area (OPA)
- Zone beyond IPA with managed vegetation.
- Outfall
- Point where drainage discharges to receiving water.
- Outlet
- Opening where water exits drainage system.
- Outlet Structure
- Control structure regulating discharge from detention.
- Outline Specification
- Brief specification of key requirements.
- Overbank Flow
- Floodwater flowing outside defined channel.
- Overland Flow
- Surface water flowing across land during heavy rain.
- Overland Flow Path
- Route taken by surface water during flooding.
P
- Pad
- Prepared level area for building or equipment placement.
- Pad Level
- Elevation of prepared building platform.
- Parametric Drawing
- Drawing with relationships updating automatically.
- Parent Lot
- Original land parcel before subdivision.
- Pavement
- Hard surface for roads, paths, or driveways.
- Pavement Design
- Engineering design for road or paving structures.
- PDF Drawing
- Drawing in portable document format.
- Peak Flood Level
- Highest water level during flood event.
- Peak Flow
- Maximum discharge rate during storm event.
- Performance Criteria
- Outcomes required rather than prescriptive solutions.
- Performance Requirements
- Outcomes buildings must achieve.
- Performance Solution
- Alternative compliance method demonstrating outcomes met.
- Performance Specification
- Specification defining required performance level.
- Permissible
- Development allowed with consent in zone.
- Permit
- Official approval for specific work.
- Permit Drawings
- Set submitted for building permit.
- Permitted Development
- Development allowed without consent.
- Perspective Drawing
- Drawing showing building as seen by eye.
- Pervious Area
- Surfaces allowing water infiltration (gardens, grass).
- Pervious Pavement
- Paving allowing water infiltration through surface.
- Phantom Line
- Light dashed line indicating moved or optional element.
- Pier
- Column-like foundation element supporting structure.
- Pile
- Deep foundation element transferring loads through weak soil.
- Piling
- Installation of deep foundation piles.
- Pipe
- Circular conduit conveying stormwater.
- Pipe Invert
- See Invert.
- Pit
- Chamber providing access to underground drainage.
- Plan of Subdivision
- Survey plan showing new lot layout.
- Planning Certificate
- Document stating planning controls on property.
- Planning Permission
- See Development Consent.
- Planning Proposal
- Request to amend Local Environmental Plan.
- Planning Regulations
- Laws governing land use and development.
- Planning Scheme
- Set of planning documents controlling development.
- Planting Plan
- Drawing specifying plant locations and species.
- Platform
- Prepared level area for construction or use.
- Plot Plan
- Alternative term for Site Plan.
- Plumbing Drawings
- Set of plans showing plumbing design.
- Plumbing Layout
- Drawing showing fixture and pipe locations.
- Plumbing Permit
- Approval for plumbing work.
- Plumbing Plan
- Drawing showing water and waste systems.
- PMF
- See Probable Maximum Flood.
- Ponding
- Accumulation of water on surface due to inadequate drainage.
- Power Plan
- Drawing showing electrical power system.
- Precinct
- Defined area with specific planning controls.
- Precinct Plan
- Detailed plan for defined area.
- Preferred Scheme
- Design option selected for development.
- Preliminary Assessment
- Initial review of development proposal.
- Preliminary Concept
- Initial design ideas before development.
- Preliminary Design
- Early design concepts and sketches before detailed planning.
- Preliminary Drawing
- Drawing before final approval.
- Preliminary Sketch
- Initial rough drawings of design concepts.
- Prescribed Development
- Development requiring specific assessment.
- Prescriptive Specification
- Specification detailing exact materials and methods.
- Priority Precinct
- Area designated for accelerated development.
- Probable Maximum Flood (PMF)
- Largest flood that could conceivably occur.
- Proctor Test
- Standard soil compaction test in laboratory.
- Profile
- Cross-sectional view of ground or proposed earthworks.
- Program Verification
- Confirming project requirements are met in design.
- Prohibited Development
- Development not permitted in zone.
- Prohibition
- Land use not permitted in zone.
- Project Manager
- Professional managing all aspects of project delivery.
- Project Manual
- Comprehensive document containing all project information.
- Public Consultation
- Process seeking community views on proposals.
- Public Domain
- Publicly accessible areas.
- Public Exhibition
- Period when community can view and comment on proposals.
- Public Notification
- Informing community of development proposals.
Q
- Q100
- 100-year average recurrence interval flood (1% AEP).
- Quality Plan
- Document establishing quality control procedures.
- Quality Standards
- Required levels of workmanship and materials.
- Quantity Schedule
- List with quantities of materials.
- Quantity Surveyor
- Professional estimating costs and managing budgets.
R
- Radiant Heat
- Heat transfer through radiation from fire.
- Radiant Heat Flux
- Intensity of radiant heat measured in kW/m².
- Raft Foundation
- Continuous reinforced slab foundation distributing loads.
- Rain Garden
- Planted depression collecting and filtering stormwater.
- Rainfall Intensity
- Rate of rainfall for design storm event.
- Raised Floor
- Floor elevated above flood planning level.
- Ramp
- Sloped surface connecting different levels.
- Raster Drawing
- Drawing composed of pixels.
- Reconfiguration
- Subdivision or consolidation changing lot configuration.
- Record Documentation
- Official documents maintained for reference.
- Record Drawing
- Drawing maintained showing final construction.
- Record Set
- Final approved drawings for project record.
- Redline
- Markup of drawing with red markings.
- Redlined Drawing
- Drawing marked with corrections or changes.
- Reduced Level (RL)
- Elevation above Australian Height Datum (AHD).
- Reference Line
- Line from which measurements are taken.
- Referral
- Sending application to external agency for comment.
- Reflected Ceiling Plan
- Drawing showing ceiling design and features.
- Reflected Plan
- See Reflected Ceiling Plan.
- Regional Plan
- Strategic plan covering multiple local government areas.
- Residue Lot
- Remaining land after subdivision of portions.
- Retaining Structure
- Wall or system preventing soil movement.
- Retaining Wall
- Structure holding back soil at elevation change.
- Retention Basin
- Basin permanently holding water with no outflow.
- Revision Cloud
- Outline indicating modified area.
- Revision Delta
- Triangle symbol indicating revision.
- Revision Mark
- Symbol indicating drawing changes.
- Revision Note
- Annotation explaining drawing change.
- Rezone
- Change zoning classification of land.
- Rezoning
- Process of changing land use zoning.
- Rezoning Application
- Request to change land's zoning classification.
- RFI (Request for Information)
- Question submitted regarding plans or specifications.
- RFI Drawing
- Drawing submitted with request for information.
- Right of Carriageway
- Easement for vehicle access across land.
- Right of Way
- Easement for pedestrian or vehicle access.
- Riparian Land
- Land adjacent to watercourse.
- Riprap
- Large rock protecting channels from erosion.
- River Flooding
- Flooding from river overflowing banks.
- Riverine Flooding
- See River Flooding.
- RL
- See Reduced Level.
- Roads and Drainage
- Infrastructure required in subdivisions.
- Roadworks
- Construction or maintenance of roads and pavements.
- Rock Excavation
- Removal of solid rock requiring breaking or blasting.
- Roof Drainage
- System collecting and conveying roof water.
- Roof Framing Plan
- Drawing showing structural roof system.
- Roof Plan
- Drawing showing roof layout and features.
- Runoff
- Water flowing across surface from rainfall.
- Runoff Coefficient
- Factor relating rainfall to runoff volume.
S
- Safety Plan
- Document outlining safety procedures.
- Safety Standards
- Requirements ensuring occupant safety.
- Scale
- Ratio between drawing size and actual size.
- Scale Bar
- Graphic showing measurement scale.
- Schedule
- List specifying components, materials, or finishes.
- Schematic Design (SD)
- Initial design phase establishing basic concept and form.
- Schematic Design Phase
- First major phase of architectural design development.
- Schematic Drawing
- Simplified drawing showing basic concepts.
- Scheme Refinement
- Process improving selected design scheme.
- Scour
- Erosion of soil by flowing water.
- Scour Protection
- Rock or concrete preventing erosion.
- SD
- See Schematic Design.
- Section
- Drawing showing building cut vertically through space.
- Section 4.55 Modification
- NSW system for modifying development consents.
- Section 68
- NSW Local Government Act approval for activities.
- Section 73
- Queensland instrument creating easements and covenants.
- Section 88B
- NSW instrument creating easements and restrictions.
- Sections
- Plural of Section.
- Sediment
- Soil particles transported and deposited by water.
- Sediment Basin
- Temporary pond capturing sediment during construction.
- Sediment Control
- Measures preventing soil washing into waterways.
- Sedimentation
- Settling of suspended particles in water.
- SEPP
- See State Environmental Planning Policy.
- Services
- Utilities required for subdivision (water, sewer, electricity, gas, communications).
- Set Out
- Marking site locations for construction elements.
- Setback
- Minimum distance from boundary to building.
- Setting Out
- Process of marking building positions on site.
- Sewer Connection
- Connection to public sewerage system.
- Sewer Plan
- Drawing showing wastewater system routing.
- Sheet Flow
- Shallow uniform flow across surface.
- Shop Drawing
- Drawing prepared by contractor or supplier.
- Shop Drawings
- Plural of Shop Drawing.
- Shoring
- Temporary support for excavation walls or structures.
- Sign-Off
- Official approval that work meets standards.
- Silt
- Fine soil particles easily transported by water.
- Silt Fence
- Temporary fabric barrier trapping sediment.
- Site Classification
- Vegetation and slope affecting bushfire behaviour.
- Site Compatibility Certificate
- Approval for building on certain sites.
- Site Cut
- Excavation to lower site levels.
- Site Fill
- Material raising site levels.
- Site Level
- Elevation of site relative to datum.
- Site Manager
- Senior on-site professional managing construction activities.
- Site Plan
- Drawing showing building location on property.
- Site Plans
- Plural of Site Plan.
- Site Survey
- Measurement and mapping of existing site conditions.
- Sketch Design
- Preliminary drawn representations of design.
- Slope
- Incline of ground surface, embankment, or cutting.
- Slope Stability
- Resistance of slope to sliding or failure.
- Soakage
- Infiltration of water into soil.
- Soakage Trench
- Gravel-filled trench allowing water infiltration.
- Soakaway
- Underground pit or trench for water infiltration.
- Soil Classification
- System categorising soil types and properties.
- Soil Profile
- Vertical section showing soil layers and characteristics.
- Soil Report
- See Geotechnical Report.
- Soil Test
- Laboratory or field testing of soil properties.
- Solid Line
- Continuous line indicating visible element.
- Space Planning
- Arrangement of spaces for optimal functionality.
- Special Conditions
- Project-specific contract modifications.
- Special Specifications
- Requirements for specific trades or items.
- Specification
- Detailed written description of materials and workmanship.
- Specifications
- Plural of Specification.
- Spill
- Overflow point at top of detention basin.
- Spillway
- Channel conveying overflow from storage.
- Spoil
- Excavated material not reused on site.
- Spot Rezoning
- Rezoning small site different from surrounding area.
- Spread Footing
- Wide shallow foundation distributing loads.
- SSD
- See State Significant Development.
- SSI
- See State Significant Infrastructure.
- Staged Development
- See Staging.
- Staging
- Developing subdivision in sequential phases.
- State Environmental Planning Policy (SEPP)
- Planning policy overriding local controls.
- State Significant Development (SSD)
- Major project determined by state government.
- State Significant Infrastructure (SSI)
- Major infrastructure project of state importance.
- State Significant Precinct
- Large area declared significant for state.
- Storm Event
- Rainfall of specific intensity and duration.
- Stormwater
- Rainwater flowing across surfaces and into drains.
- Stormwater Flooding
- Flooding from inadequate stormwater drainage.
- Stormwater Management Plan
- Strategy for site drainage and water quality.
- Stormwater Quality
- Measures treating runoff before discharge.
- Strata Title
- Subdivision creating individually owned units with common property.
- Strategic Plan
- Long-term planning vision and direction.
- Strategic Planning
- Long-term land use and infrastructure planning.
- Strip Footing
- Continuous foundation beneath walls.
- Structural Certificate
- Document confirming structural integrity.
- Structural Engineer
- Professional designing structural systems.
- Structural Safety
- Requirements ensuring building stability.
- Structure Plan
- Framework guiding future development of area.
- Sub-contractor
- Contractor working under main contractor.
- Subdivision
- Division of land into two or more lots.
- Subdivision Application
- Request to divide land into lots.
- Subdivision Certificate
- Approval allowing lot registration.
- Subdivision Plan
- See Plan of Subdivision.
- Subdivision Works
- Infrastructure constructed for subdivision.
- Subgrade
- Prepared soil surface beneath pavement or slab.
- Submission
- Written response during public exhibition period.
- Submittal
- Contractor submission of shop drawings for approval.
- Submittal Drawing
- Drawing submitted for review and approval.
- Surcharge
- Pressure exceeding normal operating level in pipes.
- Surface Runoff
- See Runoff.
- Survey
- Measurement and mapping of land and features.
- Survey Mark
- Physical marker indicating survey point.
- Survey Peg
- Wooden stake marking site positions.
- Survey Plan
- Accurate plan showing lot boundaries and dimensions.
- Survey-Strata
- Strata subdivision using survey measurements.
- Surveyor
- Professional conducting land surveys.
- Surveyor (Land)
- Professional determining property boundaries.
- Sustainability Requirements
- Standards for environmental performance.
- Swale
- Shallow vegetated channel conveying and treating stormwater.
- Swept Path Analysis
- Analysis of vehicle turning movements.
- Symbol
- Graphic representing component or material.
T
- Technical Drawings
- Drawings specifying technical requirements.
- Technical Specifications
- Written description of technical requirements.
- Technical Specifications Document
- Detailed written specification requirements.
- Test Report
- Document recording system testing results.
- Three-Point Perspective
- Drawing with three vanishing points.
- Tide Gate
- One-way gate preventing tidal backflow.
- Time of Concentration
- Time for water to travel from furthest point to outlet.
- Timeline Diagram
- Diagram showing sequence of events.
- Title Block
- Information box on drawings with project details.
- Topographical Survey
- Survey mapping site contours and features.
- Topography
- Surface features and elevation variations of land.
- Torrens Title
- System of land registration in Australia.
- Town Planner
- Professional advising on planning matters.
- Town Planning
- Profession managing urban development and land use.
- Trash Rack
- Screen preventing debris entering drainage system.
- Tree Diagram
- Hierarchical diagram branching from main elements.
- Trench
- Narrow excavation for pipes, cables, or foundations.
- Trenching
- Excavating narrow channels for services.
- Tributary
- Smaller watercourse contributing to larger.
- Two-Point Perspective
- Drawing with two vanishing points.
U
- Uncompacted Fill
- Loose fill material not yet compacted.
- Undercut
- Excavation below specified level.
- Underground Storage
- Below-ground tank or chamber storing stormwater.
- Urban Design
- Design of buildings, places, and spaces in urban environment.
- Urban Growth Area
- Land designated for future urban development.
- Urban Planning
- See Town Planning.
- Urban Release Area
- Land being transitioned from rural to urban use.
- Utility Plan
- Drawing showing locations of utilities on site.
- Utility Services
- Essential services to subdivision.
V
- Value Engineering
- Process reducing costs whilst maintaining quality.
- Variation
- Departure from planning standard or requirement.
- Vector Drawing
- Drawing using mathematical points and lines.
- Vegetation
- Plant life affecting bushfire fuel load.
- Vegetation Category
- Classification of vegetation affecting fire behaviour.
- Vegetation Classification
- System categorising vegetation for bushfire assessment.
- Velocity
- Speed of water flow in pipe or channel.
- Vibrating Roller
- Equipment compacting soil through vibration.
W
- WAE
- See Works as Executed.
- Wall Section
- Detailed section through wall assembly.
- Warranty
- Guarantee of workmanship and defect-free construction.
- Warranty Document
- Document detailing warranty coverage periods.
- Water Connection
- Connection to public water supply.
- Water Plan
- Drawing showing water supply system routing.
- Water Sensitive Urban Design (WSUD)
- Integrated approach managing urban water cycle.
- Water Supply
- Dedicated water for firefighting purposes.
- Water Table
- Upper surface of groundwater saturation zone.
- Weir
- Low wall or dam controlling water level or flow.
- Weir Box
- Structure with weir controlling discharge rate.
- Window Schedule
- List of all windows with specifications.
- Working Drawings
- Detailed drawings used by builders during construction.
- Working Plans
- See Working Drawings.
- Workmanship Standards
- Required quality of construction work.
- Works as Executed (WAE)
- Plans showing constructed infrastructure location.
- WSUD
- See Water Sensitive Urban Design.
Z
- Zone
- Area with specific land use controls.
- Zoning
- Classification of land into use categories.
- Zoning Certificate
- Certificate stating property's zoning.
- Zoning Map
- Map showing land use zones.