Utilities
Who handles NBN and phone connections when building a home?
Step-by-step: Connecting NBN and phone services
Confirm your NBN technology type
Use the NBN address checker to find out what type of connection is available at your property:
FTTP (Fibre to the Premises)
FTTN (Fibre to the Node)
FTTC (Fibre to the Curb)
HFC (Hybrid Fibre Coaxial)
Fixed Wireless or Satellite (for rural areas)
The technology type affects installation requirements, speeds, and lead times.
Prewire during construction
Your builder or electrician should install:
Conduits and wall plates for data and phone outlets
NBN utility box location (external and internal)
Power points near the NBN equipment
This ensures your home is “NBN-ready” and avoids costly retrofits later.
Place an order with a retailer
Choose a service provider and plan that suits your needs (speed, data, phone options).
The retailer will coordinate with NBN Co to schedule installation and activation.
You may need to be on-site for the technician visit, especially for FTTP or FTTC setups.
Allow time for installation
Lead times vary depending on location and technology, typically 2 to 4 weeks, but longer in rural or complex sites.
If NBN infrastructure is not yet available, you may need to wait for network build or use interim solutions like mobile broadband.
What about phone services?
Most modern phone services are delivered via VoIP (Voice over Internet Protocol), which runs over your NBN connection.
Traditional copper landlines are being phased out in areas with active NBN.
Your retailer can bundle phone services with your internet plan if needed.
Bottom line: You order NBN and phone services through a retailer, but it’s crucial to confirm your connection type early and ensure your builder prewires the home correctly. This avoids delays and ensures a smooth transition to high-speed internet once you move in.